Langteng Menswear Showcase Case Study
When we received the request from the Langteng menswear store, whether the client provided renderings, construction drawings or just a few reference photos, our showcase factory had only one task: make it real. The first step is turning the drawings into manufacturable ones. Materials, colors, dimensions, quantities and uses must be checked item by item with the client until everything is fully understood; only then does the workshop start cutting and production.
1. Drawing Breakdown and Irregular Structure Calculation
In this job, drawing breakdown focuses on the entrance feature and the indoor display system. The most striking element is the blue granular-textured wall wrapping the entrance; we must calculate how this large veneer area is joined and where joints are hidden, and how wiring channels are reserved for the illuminated "LANGTEN" letters on the entrance. Inside, the ceiling features diagonally laid wood grilles with long LED strips; the spacing, thickness and hanging fixation of each grille, along with dimensions and quantities, must be counted clearly at the drawing stage. For the window on the right, how the gray textured wall is built and what scale the internal display stand has must be confirmed item by item with the client.
2. Craftsmanship Control and Display Prop Fabrication
Once the drawings are set, the workshop begins perfecting the craftsmanship of showcases and props. The right window is the highlight: its background is a rough gray textured wall hung with a row of art frames of different sizes. The wall substrate must be extremely solid, and how the frame fixings are hidden must be built into the panels in advance. For the vintage leather sofa and sculpture display stand in the window, the workshop must reserve load-bearing positions according to dimensions. The interior clothing racks use extremely thin black metal tubes with diagonal bracing; such thin-tube welding must have no false welds, and after extremely smooth polishing the matte-black finish looks premium. For the stone-textured island table in the center, edge chamfering and edge-banding flatness all depend on the team's hand skills.
3. On-Site Assembly and Detail Finishing
On site, the team first positions and steadily assembles the blue entrance panels and illuminated letters, then connects power. Inside, they lock the diagonally laid ceiling wood grilles into place one by one, ensuring even gaps. Then they assemble the indoor island table and the extremely thin metal clothing racks, keeping everything square and true. After the frames, leather sofa and sculpture in the right window are repositioned, the focus is lighting: light must land precisely on the artwork, sculpture and mannequins, with light-dark layering tried bit by bit on site. When everything is done, protective film is removed, waste is cleaned, and the job is handed over beautifully.
Custom showcases are what our factory delivers. No matter how beautiful the drawings are, the result must stand firm in the mall. From drawing and sampling to workshop processing and on-site assembly, every detail must be perfected so the design lands securely. Only then is the job truly delivered.

Current position:


