Hangzhou Airport Service Desk Case Study
When we received the customization request for the Hangzhou Xiaoshan International Airport transfer service desk, whether the client provided CAD construction drawings, sketches or just a few reference photos, our showcase factory had only one task: make it real. The first step is turning the drawings into manufacturable ones. Materials, colors, dimensions, quantities and uses must be rigorously checked item by item with the client until everything is fully understood; only then does the workshop start precision cutting.
1. On-Site Measurement and Drawing Breakdown
Facilities in airport terminals have dimensions and load-bearing as hard indicators. For on-site re-measurement, the first task is understanding floor flatness and high- and low-voltage points. This counter is arc-shaped; its span and arc length must be precisely calculated so passengers have enough space for service on both sides. Two large West Lake scenery light boxes are embedded in the counter front; how should they be embedded in the curved cabinet, and where should transformers and wiring be hidden? How should the airport floor conduit connect? And the size and layout of the "Transfer Service" text and airport logo on top must all be pinned down on site with a laser level, with cabinet thickness and overall height confirmed with the client.
2. Workshop Woodwork and Special Material Craftsmanship
In this job, the workshop's biggest challenge is joining curved stone and metal. The base is curved, so when building the substrate the wood studs must be densified along the curve and the panels must be smooth. For the outer artificial stone (or terrazzo) counter top, the factory uses CNC machines to precisely cut the curve, and where two stone pieces meet they must be hand-polished to look like a single stone with no perceptible gap. The brushed stainless steel skirting at the base requires extremely high bending precision; the slightest misalignment causes lifting. For the two large scenery light boxes on the front, the stretching of the light diffuser is key, and LED beads must be densely arranged to ensure even color and no dark patches when lit.
3. On-Site Assembly and Wear-Resistant Anti-Collision Treatment
At the terminal construction site, it is entirely precision work. Construction time is tight and requirements are strict; the team first levels and locks the curved base frame, then carefully fits the stone counter top and levels the joints. The light boxes are embedded and powered, and the color temperature of illuminated letters and light boxes is carefully checked for uniformity to ensure bright, clear lighting. Because the airport has many passengers and luggage carts, all exposed right angles of the counter must be rounded to prevent knocks. At the junction of base and floor, special wear-resistant anti-mold sealant must be used, straight and without any overflow. After overall cleaning, fingerprints on stone are wiped and the site is cleared; only then is the task complete. Our local Hangzhou source factory also makes airport projects convenient: with heavy foot traffic, even small issues later such as light box dimming or loose locks can be handled by same-city after-sales teams entering anytime, never affecting terminal operations.
Custom showcases are what our factory delivers. No matter how beautiful the drawings are, the result must stand firm on site. From drawing and sampling to workshop processing and on-site assembly, every detail must be perfected so the design lands securely. Only then is the job truly delivered.