Rebecca Showcase Case Study
When we received the customization request for the Rebecca store, whether the client provided renderings, construction drawings or just a few reference photos, our showcase factory had only one task: make it real. The first step is turning the drawings into manufacturable ones. Materials, colors, dimensions, quantities and uses must be rigorously checked item by item with the client until everything is fully understood; only then does the workshop start precision cutting.
1. Drawing Breakdown and On-Site Data Verification
Wig brand stores emphasize premium feel and spatial transparency; a slight dimensional error makes them look petty. Checking the site against renderings, the focus is the entrance feature and core display area. For the large ring of champagne-gold metal edging on the entrance, how should it be joined in sections on site so joints are hidden in visual blind spots? For the huge mannequin poster light boxes on both sides, how should the load-bearing steel frames be anchored to the original wall? For the double-layer island display table in the center, what length and width keep customers trying on wigs around it from feeling crowded? All data must be pinned down on site with a laser level, with panel thickness and wiring channels confirmed with the client.
2. Metal Edging and Lacquer Leveling Craftsmanship
In this job, the workshop's strength lies in the details where metal meets lacquer. The store uses a large amount of champagne-gold metal strip edging; such metal folding must be extremely precise, and after polishing weld points there must be no bumpiness, with brushed surface treatment keeping the grain direction consistent. For the large cream-white cabinets and shelves, substrate filling and leveling is an iron rule: any unevenness will be exposed under bright spotlights. In the shelf display areas on both sides, concealed LED strips must have channels reserved in advance to be "light visible, lamp invisible." The transition between the island table's metal skirting and the counter top must also be pre-assembled in the factory to ensure perfect fit.
3. On-Site Assembly and Flawless Delivery
For on-site assembly of such light-colored light-luxury stores, knocked-off paint and glue overflow are the biggest fears. The team first lays floor protection across the site, positions the central island table first, and levels the bottom supports so the counter is absolutely level. The display cabinets on both sides and the metal wall door frames are then stood firm one by one. Power is connected to all illuminated letters and poster light boxes, and color temperature is adjusted one by one so light on the wig mannequins looks natural. At junctions between cabinets and walls and between metal strips and floor tiles, sealing most tests craftsmanship: on light surfaces, any excess glue immediately looks dirty, so the team applies masking tape and uses the finest nozzle to smooth bit by bit, then removes film, cleans glue and clears wood chips. Our factory is right here in Hangzhou, focusing on long-term peace of mind: if a shelf LED strip needs replacing or cabinet hardware needs fine adjustment later, a same-city team can come over once and get it done, with no cross-city communication hassle.
Custom showcases are what our factory delivers. No matter how beautiful the drawings are, the result must stand firm on site. From drawing and sampling to workshop processing and on-site assembly, every detail must be perfected so the design lands securely. Only then is the job truly delivered.

Current position:

