Trojan Kingdom Children's Playground Showcase Props Case Study
When we received the customization request for the Trojan Kingdom mall store, whether the client provided renderings, construction drawings or just a few reference photos, our showcase factory had only one task: make it real. As a core store of the brand, this job is large in scale with many irregular shapes; the first step is turning the drawings into manufacturable ones. Materials, colors, dimensions, quantities and uses must be rigorously checked item by item with the client until everything is fully understood; only then does the workshop start precision cutting.
1. Drawing Breakdown and Irregular Entrance Briefing
This wide-span irregular entrance feature is the toughest bone in the whole job. Checking the site against the renderings, the first task is clearly breaking down the stepped, crisscrossing "ridge" frame of the entrance on the drawings. The entrance surface consists of dozens of puzzle-like shapes in different colors; the size, thickness and even chamfer radius of each piece must be precise to the millimeter. For the huge cartoon character display window on the left, how should the load of ultra-clear glass be divided? For the row of three-dimensional illuminated "Trojan Kingdom" letters on the entrance, how should high-voltage cables be threaded through the complex zigzag frame? And for the purple herringbone partition below, how should each line be arranged? All data must be pinned down on site with a laser level, with no error allowed.
2. Workshop Woodwork and Complex Color-Blocking Craftsmanship
Once the workshop starts, this job tests absolute overall control. For the zigzag roof shape of the entrance, carpenters must weld the substrate with thickened square tubes, cover it with multi-layer plywood, and make irregular cuts extremely smooth with no burrs. The large purple edge-wrapped lacquer on the surface is sprayed in a dust-free booth with extremely high requirements: true color and hard finish. For the colorful cartoon graffiti wall panels, the factory uses precision CNC engraving combined with UV printing or special lacquer processes, assembling piece by piece with smooth joints. For the purple herringbone glass partition under the entrance, metal edging must be bent with exact precision so glass fits perfectly. All illuminated letters and shelf LED strips are segmented to size in the factory, test-lit to eliminate problems in advance, packed and ready for shipment.
3. On-Site Segmented Hoisting and Flawless Finishing
Moving oversized pieces into a mall depends entirely on the on-site team's hard skills. The entrance has a large span, so we pre-segment it in the factory. On site, the team first sets up mobile scaffolding as a work platform. Four installers cooperate to haul the factory-made entrance modules up by rope; team members on the scaffolding receive them, find the position and tighten screws, ensuring the entire zigzag line is square and true. The large glass window on the left is carefully embedded, and the giant cartoon models are powered and lit. Because of the color-blocking process, knocked-off paint is the biggest on-site fear, so all panels are installed with protective film. At junctions between cabinets, partitions and mall floor, sealing must use the finest nozzle, applying masking tape and running lines bit by bit without dirtying the patterned floor. After completion, film is removed, glue cleaned, and packaging waste cleared away, delivering a perfect result to a major client. As a local Hangzhou source factory, we dare to take on major clients and our after-sales absolutely keeps up: if an entrance letter fails or partition hardware wears later, our same-city engineering team comes directly to maintain it, never letting the brand's daily operations down.
Custom showcases are what our factory delivers. No matter how beautiful the drawings are, the result must stand firm on site. From drawing and sampling to workshop processing and on-site assembly, every detail must be perfected so the design lands securely. Only then is the job truly delivered.

Current position:


